product_development_planning

This is an old revision of the document!


As of March 20, 2013

3 Month Planning

This is approaching the limits of what we can do in 3 months but the things that fall off the back end will probably be priorities in the next 3 month cycle.

  • Leica Cell Driver (Mike)
  • SmartGrade Labeling and Progress Topo (Bill)
  • Access API for IOS client (depends on hire schedule) (Mike)
  • ADF to 4D import API (Bill)
  • ADF Writer functionality expansion (Bill)
    • Key protected
    • AGTEK Access Upload
    • Read and Alignment of PDF/Images/KMZ
  • Deferred Uploader/Android AGTEK Access (Mike)
  • SmartPlan for Android/IOS (Bill, MikeA, Consultant to be named later)
  • Amazon Server Redundancy Planning & Implementation (Mike)

6 Month Planning

Since this is farther out, the order of projects is much more variable.

12 Month Planning

As of December 19, 2012

3 Month Planning

In general order of implementation (barring impediments like no cell subscription)

  • SmartGrade RTK - Altus Cell Driver (Mike)
  • Base Station Setup - Topcon Driver (Mike)
  • AGTEK Access Setup
  • SmartDirt Picture Point Tracking (Mike)
  • SmartGrade RTK - Stockpile (Bill) - includes Collada Export
  • SmartGrade RTK - Progress Topo
  • Access API for IOS client (depends on hire schedule) (Mike)
  • ADF to 4D import API (Bill)
  • Amazon Server Redundancy Planning & Implementation (Mike)

6 Month Planning

Since this is farther out, the order of projects is much more variable.

  • AGTEK Access/Explorer implementation (ala' Dropbox) (Mike)
  • PlanView App
  • Machine Control
  • Android Tablet optimized layouts

12 Month Planning