Development Planning as of Jan 13, 2014

3 Month Planning

This is approaching the limits of what we can do in 3 months but the things that fall off the back end will probably be priorities in the next 3 month cycle.

Mobile

  • SmartPlan IOS (Mike, Focalshift)
  • Deferred Uploader Android Service (Mike)
  • Access SmartTrack Management API's (Mike)
  • SmartTrack Management (Bill & Mike)
  • SmartTrack Finish (Bill)
  • SmartBlade Start - (Machine Control) (Bill)
  • Amazon Server Redundancy Implementation (Mike)

Desktop

Trackwork

  • Incorporate new Track API (Dave/Mike)
  • Strip CAD and ProfUIS (Dave)
  • New Device Support (G-Ray2, other?)
  • Revamp Import Window (Dave)
  • Report View (compile multiple reports) (Dave)

Import/Export (cross program)

  • AEC Hwy CAD Object translation (COGO, etc) (George
  • GPX support- extension for Trackwork (tracks with cycle lines/compass) (George)
  • Update TrackReader with new Server API support/Devices (George)

Materials/Underground

This project will take longer than three months to complete and should be considered a future foundation for other products.

  • New 4D Platform
    • As much platform independence as possible (hedging our Microsoft bet)
    • Common File Format - simple interchange between Sitework and Materials.
    • Multiple monitor support
    • Floating controls/windows
    • 64 Bit
    • International Support (text broken out for easier translation)
  • True 3D support (sloped areas, sloped structures, using Sitework surfaces)
  • Structure entry (Pipe, UG structures, retaining walls, abutments)
    • Export of 3D structure models to Google Earth (Collada)
  • New Print Page
  • Pipe and other structure visualization
  • Completion time assignment/Playback
  • Linkable (http) field/notes (used in mobile apps for supplier/vendor information
  • Transfer of Structures to Sitework Sectionals. Two-way data transfer

6 Month Planning

Mobile

  • Javad Support
  • AGTEK Access Drive Explorer implementation (ala' Dropbox) (Mike )
  • Topcon SR Radio and Cell compatibility (Mike)
  • Android Tablet optimized layouts (partial, some new layouts are implemented in SmartPlan and SmartTrack)

Desktop

Materials/Underground

Continues from 3 month plan

12 Month Planning

  • Android Diagnostic mode that can be turned on to send more info for debugging.
    • Use switch under preferences to turn on or eggman.txt style if neccessary (program won't start). Could be turned on at a server level although this may not help if they can't connect.

Mobile Planning as of March 20, 2013

3 Month Planning

This is approaching the limits of what we can do in 3 months but the things that fall off the back end will probably be priorities in the next 3 month cycle.

  • Leica Cell Driver (Mike) 1.0
  • Topcon SR Radio and Cell compatibility(when available) (Mike) .1
  • SmartGrade Labeling and Progress Topo (Bill) .8
  • Access API for IOS client (depends on hire schedule) (Mike) 1.0
  • ADF to 4D import API (Bill) 1.0
  • ADF Writer functionality expansion (Bill) .66
    • Key protected 1.0
    • AGTEK Access Upload 1.0
    • Read and Alignment of PDF/Images/KMZ 0
  • Deferred Uploader/Android AGTEK Access (Mike)
  • SmartPlan for Android/IOS (Bill, Mike, Consultant to be named later)
  • Amazon Server Redundancy Planning & Implementation (Mike)

6 Month Planning

  • AGTEK Access Drive Explorer implementation (ala' Dropbox) (Mike )
  • SmartTrack
  • Android Tablet optimized layouts
  • Trimble Driver SmartGrade

12 Month Planning

  • Android Diagnostic mode that can be turned on to send more info for debugging.
    • Use switch under preferences to turn on or eggman.txt style if neccessary (program won't start). Could be turned on at a server level although this may not help if they can't connect.
  • Machine Control (this may never happen)

Mobile Planning as of December 19, 2012

3 Month Planning

In general order of implementation (barring impediments like no cell subscription)

  • SmartGrade RTK - Altus Cell Driver (Mike)
  • Base Station Setup - Topcon Driver (Mike)
  • AGTEK Access Setup
  • SmartDirt Picture Point Tracking (Mike)
  • SmartGrade RTK - Stockpile (Bill) - includes Collada Export
  • SmartGrade RTK - Progress Topo
  • Access API for IOS client (depends on hire schedule) (Mike)
  • ADF to 4D import API (Bill)
  • Amazon Server Redundancy Planning & Implementation (Mike)

6 Month Planning

Since this is farther out, the order of projects is much more variable.

  • AGTEK Access/Explorer implementation (ala' Dropbox) (Mike)
  • PlanView App
  • Machine Control
  • Android Tablet optimized layouts

12 Month Planning