Previous revision
windows:underground_desktop [2020/04/20 15:35]
mikeclapp [First Release]
windows:underground_desktop [2020/04/21 23:59] (current)
mikeclapp
Line 1: Line 1:
 ====== Underground Notes ====== ====== Underground Notes ======
- 
- 
- 
-====== Current deficiencies,​ Important features & Goals ====== 
  
  
 ===== First Release ===== ===== First Release =====
  
-  * Depth Brackets (required) Goal Breakdown by pipe runs for analysis (quantities ) +  * Breakdown by pipe runs for analysis (quantities ) Suggest using line segments as natural break. 
-  * Square pipe, ellipsoidal pipe, multiple pipe, varying pipe thickness. (deficiencies)+  * Square pipe
   * Strata in depth brackets   * Strata in depth brackets
-  * Select Backfill ​calculation (deficiency)+  ​* Underground Volumes report. 
 +  ​* Select Backfill ​to fill trench capability ​
   * Quantities within Underground (deficiency)   * Quantities within Underground (deficiency)
-  ​* LandXML export of trench bottom (Goal) +  * Trench Spec to Template/​Gradework ​in GW application ​
-  ​* Trench Spec to Template in GW application ​+
  
  
 Notes Notes
  
-  * Automatically increment label each pipe segment ​ like 8” SD -1 , -2, -3 etc. Since pipe runs are typically straight between structures this gives us an easy way to break down the volumes by pipe run. Likewise they can subtotal together or be edited to be the same if multiple runs should be combined. +  * Automatically increment label each invert ​pipe segment ​ like 8” SD -1 , -2, -3 etc. Since pipe runs are typically straight between structures this gives us an easy way to break down the volumes by pipe run. Likewise they can subtotal together or be edited to be the same if multiple runs should be combined. In the case of imported Pipe runs with lots of extraneous points we should compress at some point as they are likely on the same slope
-  * We need an Underground volumes report. Imagine something like the volumes report broken down by the individual quantities per run. It should be in the Underground program. I’ll mock one up for reference+  * We need an Underground volumes report. Imagine something like the volumes report broken down by the individual quantities per run. It should be in the Underground program. 
-  * We need to open up strata layers to changing colors ​and in fact should alternate the colors automatically. The current view with them all red in profile makes it difficult to discern between layers. ​ +  * We need to open up strata layers to changing colors ​or do shades of red with increasing intensity by depth. The current view with them all red in profile makes it difficult to discern between layers. ​Using colors in the report ​screen would also serve as a legend. 
-  * On the depth bracket ​report ​we should list the pipe run like this:+ 
  
-{{:​windows:​depthbracket_w_strata.png?​400|}} 
  
  
Line 37: Line 33:
   * Added BF compaction for compaction factor for native backfill   * Added BF compaction for compaction factor for native backfill
   * Added Fill to grade option for Select backfill to allow completely filling of trench with select material   * Added Fill to grade option for Select backfill to allow completely filling of trench with select material
-  * Added creation of Gradework Template/​Surfaces+  * Added creation of Gradework Template/​Surfaces ​(Changed to be another menu command "Apply Trenches"​ that will allow choosing of pipe's to apply over in Gradework.
  
 +Rectangular pipe can be represented as a tab as shown here but could just as easily be a radio button that changes the interface. Your choice. ​
  
-==== Underground ​Volumes Report ====+We lost the ability to do benches in Underground ​and it's a big omission since they represent a large number of takeoffs where a flare alone isn't sufficient. We need to model this correctly
  
 +Backfill compaction is pretty important when calculating the remaining spoils. It's another thing we lost at some point and need back.
  
-{{:​windows:​trench_volumes_report.png?800|}}+It's not uncommon that none of the trench spoils can be reused for backfill. In those cases there'​s a need for the select backfill to fill up the trench back to the grade used to enter the pipe. Checking this box does that without requiring specifying a value. This was a feature of old Edge underground but you had to remember to type a . in for a value.
  
 +Using the trench spec window to create a template for the trench in Gradework and also create a surface there. This ties the programs together and reinforces the modeling aspect in Gradework. The trench should daylight to whatever the selected surface is rather than just existing or subgrade. We should also consider using the Highway perimeter snugging routine to do the same to trenches rather than copying and clipping from the original surface.
  
 +==== Underground Volumes Report ====
  
-==== Depth Bracket Report with Strata ====+{{:​windows:​trench_volumes_report.png?​800|}}
  
  
-{{:​windows:​depthbracket_w_strata.png?​80000|}}+This isn't a complete report but the first 8" SD shows the pattern. That's a single 8" SD run but it's broken out at the structures so each run is a segment. Quantities between pipe runs is an issue brought up and you can see where users would want the extra analysis for ordering, etc.
  
 +I've included Strata in this one as an example. The different part of this is not only are the volumes accessible within underground,​ they break out the related trench quantities together. ​
  
  
-==== Depth Brackets ===== 
  
-The depth brackets function is complete compared to previous versions but has additional breakdown ​+==== Depth Bracket Report with Strata ====
  
-Here's a typical report: 
  
 +{{:​windows:​depthbracket_w_strata.png?​80000|}}
  
  
  
 +==== Depth Brackets =====
  
 +The depth brackets function is complete compared to previous versions but needs the strata breakdown.
  
  
  
- +Wishlist: Choose colors for strata ​or at least color them shades of red by depth. All of them being red doesn'​t help distinguish them. Using that color on the report would also serve as a legend.
- +
-Should we default label pipes, structures and fittings? For example if I enter in pipe label the line between each point 8" SD -1, -2, -3 and break those out in reports. The user could customize the label  +
- +
-We need a quantity report in the Underground program itself. If pipe runs were labeled then breaking out and subtotaling those values also becomes easier as well as showing rock quantities. +
- +
- +
-Wishlist: Choose colors for strata. All of them being red doesn'​t help distinguish them. Some sort of legend ​would help too +
  
 ==== Quantity Reports ===== ==== Quantity Reports =====
windows/underground_desktop.1587396956.txt.gz · Last modified: 2020/04/20 15:35 by mikeclapp