This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | |||
smartsuite:smartplan_materials_enhancements [2020/05/28 23:20] mikeclapp [Reporting Objects] |
smartsuite:smartplan_materials_enhancements [2021/07/02 19:07] (current) mikeclapp [Reporting Objects] |
||
---|---|---|---|
Line 58: | Line 58: | ||
It also allows the user to override office numbers for actual. An example would be a pad originally specified as 4" (.333 section). If a rapid change came about and it had to be six inches the foreman could overide what the estimator specified with.5 for the section and show the updated quantities for on the fly ordering. | It also allows the user to override office numbers for actual. An example would be a pad originally specified as 4" (.333 section). If a rapid change came about and it had to be six inches the foreman could overide what the estimator specified with.5 for the section and show the updated quantities for on the fly ordering. | ||
- | |||
- | |||
- | ==== Reporting Objects ==== | ||
- | |||
- | |||
- | **Earthwork/Gradework** | ||
- | |||
- | * Stripping Areas | ||
- | * Report Regions | ||
- | * Sectional Regions | ||
- | * Balance Regions | ||
- | * | ||
- | |||
- | |||
- | **Materials** | ||
- | * Lengths | ||
- | * Areas | ||
- | * Counts | ||
- | |||
- | |||
- | |||
- | |||
- | **Underground** | ||
- | * Pipes | ||
- | * Verticals | ||
- | * Fittings | ||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||