User Tools

Site Tools


product_development_planning

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
product_development_planning [2014/01/15 00:46]
mikeclapp [Mobile]
product_development_planning [2014/01/15 02:01] (current)
mikeclapp [Desktop]
Line 12: Line 12:
   * Deferred Uploader Android Service (Mike)   * Deferred Uploader Android Service (Mike)
   * Access SmartTrack Management API's (Mike)   * Access SmartTrack Management API's (Mike)
 +  * SmartTrack Management (Bill & Mike)
   * SmartTrack Finish (Bill)   * SmartTrack Finish (Bill)
   * SmartBlade Start - (Machine Control) (Bill)   * SmartBlade Start - (Machine Control) (Bill)
Line 19: Line 20:
  === Trackwork ===  === Trackwork ===
  
-  * Incorporate new Track API +  * Incorporate new Track API (Dave/Mike) 
-  * Strip CAD and ProfUIS+  * Strip CAD and ProfUIS ​(Dave)
   * New Device Support (G-Ray2, other?)   * New Device Support (G-Ray2, other?)
-  * Revamp Import Window +  * Revamp Import Window ​(Dave) 
-  * Report View (compile multiple reports)+  * Report View (compile multiple reports) ​(Dave) 
 + 
 + === Import/​Export ​ (cross program)=== 
 +  * AEC Hwy CAD Object translation (COGO, etc) (George 
 +  * GPX support- extension for Trackwork (tracks with cycle lines/​compass) (George) 
 +  * Update TrackReader with new Server API support/​Devices (George) 
  
  === Materials/​Underground ===  === Materials/​Underground ===
Line 29: Line 36:
  
   * New 4D Platform   * New 4D Platform
 +    * As much platform independence as possible (hedging our Microsoft bet)
     * Common File Format - simple interchange between Sitework and Materials.     * Common File Format - simple interchange between Sitework and Materials.
     * Multiple monitor support     * Multiple monitor support
Line 42: Line 50:
   * Linkable (http) field/notes (used in mobile apps for supplier/​vendor information   * Linkable (http) field/notes (used in mobile apps for supplier/​vendor information
   * Transfer of Structures to Sitework Sectionals. Two-way data transfer   * Transfer of Structures to Sitework Sectionals. Two-way data transfer
-  *   +
 ===== 6 Month Planning ===== ===== 6 Month Planning =====
  
product_development_planning.1389746774.txt.gz · Last modified: 2014/01/15 00:46 by mikeclapp