User Tools

Site Tools


product_development_planning

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
product_development_planning [2014/01/14 22:37]
mikeclapp [6 Month Planning]
product_development_planning [2014/01/15 02:01] (current)
mikeclapp [Desktop]
Line 9: Line 9:
 ==== Mobile ==== ==== Mobile ====
  
 +  * SmartPlan IOS (Mike, Focalshift)
   * Deferred Uploader Android Service (Mike)   * Deferred Uploader Android Service (Mike)
   * Access SmartTrack Management API's (Mike)   * Access SmartTrack Management API's (Mike)
-  * Topcon SR Radio and Cell compatibility ​(Mike) +  * SmartTrack Management ​(Bill & Mike) 
-  * Javad Support +  * SmartTrack Finish ​(Bill) 
-  * SmartTrack Finish +  * SmartBlade Start - (Machine Control) (Bill)
-  * SmartBlade Start - (Machine Control) +
-  * SmartPlan IOS (Mike, Focalshift)+
   * Amazon Server Redundancy Implementation (Mike)   * Amazon Server Redundancy Implementation (Mike)
- 
- 
 ==== Desktop ==== ==== Desktop ====
  
  === Trackwork ===  === Trackwork ===
  
-  * Incorporate new Track API +  * Incorporate new Track API (Dave/Mike) 
-  * Strip CAD and ProfUIS+  * Strip CAD and ProfUIS ​(Dave)
   * New Device Support (G-Ray2, other?)   * New Device Support (G-Ray2, other?)
-  * Revamp Import Window +  * Revamp Import Window ​(Dave) 
-  * Report View (compile multiple reports)+  * Report View (compile multiple reports) ​(Dave) 
 + 
 + === Import/​Export ​ (cross program)=== 
 +  * AEC Hwy CAD Object translation (COGO, etc) (George 
 +  * GPX support- extension for Trackwork (tracks with cycle lines/​compass) (George) 
 +  * Update TrackReader with new Server API support/​Devices (George) 
  
  === Materials/​Underground ===  === Materials/​Underground ===
 +This project will take longer than three months to complete and should be considered a future foundation for other products.
  
   * New 4D Platform   * New 4D Platform
 +    * As much platform independence as possible (hedging our Microsoft bet)
 +    * Common File Format - simple interchange between Sitework and Materials.
     * Multiple monitor support     * Multiple monitor support
     * Floating controls/​windows     * Floating controls/​windows
-  ​* True 3D support+    * 64 Bit 
 +    * International Support (text broken out for easier translation) 
 +  ​* True 3D support ​(sloped areas, sloped structures, using Sitework surfaces)
   * Structure entry (Pipe, UG structures, retaining walls, abutments)   * Structure entry (Pipe, UG structures, retaining walls, abutments)
 +    * Export of 3D structure models to Google Earth (Collada)
 +  * New Print Page
 +  * Pipe and other structure visualization
 +  * Completion time assignment/​Playback
 +  * Linkable (http) field/notes (used in mobile apps for supplier/​vendor information
 +  * Transfer of Structures to Sitework Sectionals. Two-way data transfer
 +
 ===== 6 Month Planning ===== ===== 6 Month Planning =====
  
 ==== Mobile ==== ==== Mobile ====
  
 +  * Javad Support
   * AGTEK Access Drive Explorer implementation (ala' Dropbox) (Mike )   * AGTEK Access Drive Explorer implementation (ala' Dropbox) (Mike )
 +  * Topcon SR Radio and Cell compatibility (Mike)
   * Android Tablet optimized layouts (partial, some new layouts are implemented in SmartPlan and SmartTrack)   * Android Tablet optimized layouts (partial, some new layouts are implemented in SmartPlan and SmartTrack)
-  *  
- 
- 
  
 ==== Desktop ==== ==== Desktop ====
Line 50: Line 64:
 === Materials/​Underground === === Materials/​Underground ===
  
-  ​* New 4D Platform +  ​Continues from 3 month plan
-    * Multiple monitor support +
-    * Floating controls/​windows +
-  * True 3D support +
-  * Structure entry (Pipe, UG structures, retaining walls, abutments)+
 ===== 12 Month Planning ===== ===== 12 Month Planning =====
  
product_development_planning.1389739075.txt.gz · Last modified: 2014/01/14 22:37 by mikeclapp