User Tools

Site Tools


product_development_planning

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
product_development_planning [2014/01/14 01:57]
mikeclapp [3 Month Planning]
product_development_planning [2014/01/15 02:01] (current)
mikeclapp [Desktop]
Line 1: Line 1:
-====== ​Mobile ​Planning as of Jan 13, 2014 ======+====== ​Development ​Planning as of Jan 13, 2014 ======
  
  
Line 6: Line 6:
 This is approaching the limits of what we can do in 3 months but the things that fall off the back end will probably be priorities in the next 3 month cycle. This is approaching the limits of what we can do in 3 months but the things that fall off the back end will probably be priorities in the next 3 month cycle.
  
 +
 +==== Mobile ====
 +
 +  * SmartPlan IOS (Mike, Focalshift)
   * Deferred Uploader Android Service (Mike)   * Deferred Uploader Android Service (Mike)
   * Access SmartTrack Management API's (Mike)   * Access SmartTrack Management API's (Mike)
-  * Topcon SR Radio and Cell compatibility ​(Mike) +  * SmartTrack Management ​(Bill & Mike) 
-  * Javad Support +  * SmartTrack Finish ​(Bill) 
-  * SmartTrack Finish +  * SmartBlade Start - (Machine Control) (Bill)
-  * SmartBlade Start - (Machine Control) +
-  * SmartPlan IOS (Mike, Focalshift)+
   * Amazon Server Redundancy Implementation (Mike)   * Amazon Server Redundancy Implementation (Mike)
 +==== Desktop ====
 +
 + === Trackwork ===
 +
 +  * Incorporate new Track API (Dave/Mike)
 +  * Strip CAD and ProfUIS (Dave)
 +  * New Device Support (G-Ray2, other?)
 +  * Revamp Import Window (Dave)
 +  * Report View (compile multiple reports) (Dave)
 +
 + === Import/​Export ​ (cross program)===
 +  * AEC Hwy CAD Object translation (COGO, etc) (George
 +  * GPX support- extension for Trackwork (tracks with cycle lines/​compass) (George)
 +  * Update TrackReader with new Server API support/​Devices (George)
 +
 +
 + === Materials/​Underground ===
 +This project will take longer than three months to complete and should be considered a future foundation for other products.
 +
 +  * New 4D Platform
 +    * As much platform independence as possible (hedging our Microsoft bet)
 +    * Common File Format - simple interchange between Sitework and Materials.
 +    * Multiple monitor support
 +    * Floating controls/​windows
 +    * 64 Bit
 +    * International Support (text broken out for easier translation)
 +  * True 3D support (sloped areas, sloped structures, using Sitework surfaces)
 +  * Structure entry (Pipe, UG structures, retaining walls, abutments)
 +    * Export of 3D structure models to Google Earth (Collada)
 +  * New Print Page
 +  * Pipe and other structure visualization
 +  * Completion time assignment/​Playback
 +  * Linkable (http) field/notes (used in mobile apps for supplier/​vendor information
 +  * Transfer of Structures to Sitework Sectionals. Two-way data transfer
  
 ===== 6 Month Planning ===== ===== 6 Month Planning =====
  
 +==== Mobile ====
 +
 +  * Javad Support
   * AGTEK Access Drive Explorer implementation (ala' Dropbox) (Mike )   * AGTEK Access Drive Explorer implementation (ala' Dropbox) (Mike )
 +  * Topcon SR Radio and Cell compatibility (Mike)
   * Android Tablet optimized layouts (partial, some new layouts are implemented in SmartPlan and SmartTrack)   * Android Tablet optimized layouts (partial, some new layouts are implemented in SmartPlan and SmartTrack)
-  *  
  
 +==== Desktop ====
 +
 +=== Materials/​Underground ===
  
 +  Continues from 3 month plan
 ===== 12 Month Planning ===== ===== 12 Month Planning =====
  
product_development_planning.1389664668.txt.gz · Last modified: 2014/01/14 01:57 by mikeclapp