This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision Next revision | Previous revision | ||
| product_development_planning [2014/01/13 23:58] mikeclapp | product_development_planning [2014/01/15 02:01] (current) mikeclapp [Desktop] | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| - | ====== Mobile Planning as of Jan 13, 2014 ====== | + | ====== Development Planning as of Jan 13, 2014 ====== | 
| Line 6: | Line 6: | ||
| This is approaching the limits of what we can do in 3 months but the things that fall off the back end will probably be priorities in the next 3 month cycle. | This is approaching the limits of what we can do in 3 months but the things that fall off the back end will probably be priorities in the next 3 month cycle. | ||
| + | |||
| + | ==== Mobile ==== | ||
| + | |||
| + | * SmartPlan IOS (Mike, Focalshift) | ||
| * Deferred Uploader Android Service (Mike) | * Deferred Uploader Android Service (Mike) | ||
| * Access SmartTrack Management API's (Mike) | * Access SmartTrack Management API's (Mike) | ||
| - | * Topcon SR Radio and Cell compatibility (Mike) | + | * SmartTrack Management (Bill & Mike) | 
| - | * Javad Support | + | * SmartTrack Finish (Bill) | 
| - | * SmartTrack Finish | + | * SmartBlade Start - (Machine Control) (Bill) | 
| - | * SmartBlade - Machine Control | + | |
| - | * SmartPlan IOS (Mike, Focalshift) | + | |
| * Amazon Server Redundancy Implementation (Mike) | * Amazon Server Redundancy Implementation (Mike) | ||
| + | ==== Desktop ==== | ||
| + | === Trackwork === | ||
| + | * Incorporate new Track API (Dave/Mike) | ||
| + | * Strip CAD and ProfUIS (Dave) | ||
| + | * New Device Support (G-Ray2, other?) | ||
| + | * Revamp Import Window (Dave) | ||
| + | * Report View (compile multiple reports) (Dave) | ||
| + | === Import/Export  (cross program)=== | ||
| + | * AEC Hwy CAD Object translation (COGO, etc) (George | ||
| + | * GPX support- extension for Trackwork (tracks with cycle lines/compass) (George) | ||
| + | * Update TrackReader with new Server API support/Devices (George) | ||
| - | * Key protected | + | |
| - | * AGTEK Access Upload | + | === Materials/Underground === | 
| - | * Read and Alignment of PDF/Images/KMZ | + | This project will take longer than three months to complete and should be considered a future foundation for other products. | 
| - | * Deferred Uploader/Android AGTEK Access (Mike) | + | |
| - | * SmartPlan IOS (Mike, Focalshift) | + | * New 4D Platform | 
| - | * Amazon Server Redundancy Implementation (Mike) | + | * As much platform independence as possible (hedging our Microsoft bet) | 
| + | * Common File Format - simple interchange between Sitework and Materials. | ||
| + | * Multiple monitor support | ||
| + | * Floating controls/windows | ||
| + | * 64 Bit | ||
| + | * International Support (text broken out for easier translation) | ||
| + | * True 3D support (sloped areas, sloped structures, using Sitework surfaces) | ||
| + | * Structure entry (Pipe, UG structures, retaining walls, abutments) | ||
| + | * Export of 3D structure models to Google Earth (Collada) | ||
| + | * New Print Page | ||
| + | * Pipe and other structure visualization | ||
| + | * Completion time assignment/Playback | ||
| + | * Linkable (http) field/notes (used in mobile apps for supplier/vendor information | ||
| + | * Transfer of Structures to Sitework Sectionals. Two-way data transfer | ||
| ===== 6 Month Planning ===== | ===== 6 Month Planning ===== | ||
| + | ==== Mobile ==== | ||
| + | |||
| + | * Javad Support | ||
| * AGTEK Access Drive Explorer implementation (ala' Dropbox) (Mike ) | * AGTEK Access Drive Explorer implementation (ala' Dropbox) (Mike ) | ||
| + | * Topcon SR Radio and Cell compatibility (Mike) | ||
| * Android Tablet optimized layouts (partial, some new layouts are implemented in SmartPlan and SmartTrack) | * Android Tablet optimized layouts (partial, some new layouts are implemented in SmartPlan and SmartTrack) | ||
| - | * | ||
| + | ==== Desktop ==== | ||
| + | |||
| + | === Materials/Underground === | ||
| + | Continues from 3 month plan | ||
| ===== 12 Month Planning ===== | ===== 12 Month Planning ===== | ||