User Tools

Site Tools


product_development_planning

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
product_development_planning [2013/03/20 22:46]
mikeclapp [3 Month Planning]
product_development_planning [2014/01/15 02:01] (current)
mikeclapp [Desktop]
Line 1: Line 1:
-====== ​As of March 202013 ======+====== ​Development Planning as of Jan 132014 ======
  
  
Line 6: Line 6:
 This is approaching the limits of what we can do in 3 months but the things that fall off the back end will probably be priorities in the next 3 month cycle. This is approaching the limits of what we can do in 3 months but the things that fall off the back end will probably be priorities in the next 3 month cycle.
  
-  * Leica Cell Driver (Mike) 
-  * SmartGrade Labeling and Progress Topo (Bill) 
-  * Access API for IOS client (depends on hire schedule) (Mike) 
-  * ADF to 4D import API (Bill) 
-  * ADF Writer functionality expansion (Bill) 
-    * Key protected 
-    * AGTEK Access Upload 
-    * Read and Alignment of PDF/​Images/​KMZ 
-  * Deferred Uploader/​Android AGTEK Access (Mike) 
-  * SmartPlan for Android/IOS (Bill, MikeA, Consultant to be named later) 
-  * Amazon Server Redundancy Planning & Implementation (Mike) 
  
 +==== Mobile ====
  
 +  * SmartPlan IOS (Mike, Focalshift)
 +  * Deferred Uploader Android Service (Mike)
 +  * Access SmartTrack Management API's (Mike)
 +  * SmartTrack Management (Bill & Mike)
 +  * SmartTrack Finish (Bill)
 +  * SmartBlade Start - (Machine Control) (Bill)
 +  * Amazon Server Redundancy Implementation (Mike)
 +==== Desktop ====
 +
 + === Trackwork ===
 +
 +  * Incorporate new Track API (Dave/Mike)
 +  * Strip CAD and ProfUIS (Dave)
 +  * New Device Support (G-Ray2, other?)
 +  * Revamp Import Window (Dave)
 +  * Report View (compile multiple reports) (Dave)
 +
 + === Import/​Export ​ (cross program)===
 +  * AEC Hwy CAD Object translation (COGO, etc) (George
 +  * GPX support- extension for Trackwork (tracks with cycle lines/​compass) (George)
 +  * Update TrackReader with new Server API support/​Devices (George)
 +
 +
 + === Materials/​Underground ===
 +This project will take longer than three months to complete and should be considered a future foundation for other products.
 +
 +  * New 4D Platform
 +    * As much platform independence as possible (hedging our Microsoft bet)
 +    * Common File Format - simple interchange between Sitework and Materials.
 +    * Multiple monitor support
 +    * Floating controls/​windows
 +    * 64 Bit
 +    * International Support (text broken out for easier translation)
 +  * True 3D support (sloped areas, sloped structures, using Sitework surfaces)
 +  * Structure entry (Pipe, UG structures, retaining walls, abutments)
 +    * Export of 3D structure models to Google Earth (Collada)
 +  * New Print Page
 +  * Pipe and other structure visualization
 +  * Completion time assignment/​Playback
 +  * Linkable (http) field/notes (used in mobile apps for supplier/​vendor information
 +  * Transfer of Structures to Sitework Sectionals. Two-way data transfer
  
 ===== 6 Month Planning ===== ===== 6 Month Planning =====
  
-Since this is farther out, the order of projects is much more variable. ​+==== Mobile ====
  
 +  * Javad Support
 +  * AGTEK Access Drive Explorer implementation (ala' Dropbox) (Mike )
 +  * Topcon SR Radio and Cell compatibility (Mike)
 +  * Android Tablet optimized layouts (partial, some new layouts are implemented in SmartPlan and SmartTrack)
  
 +==== Desktop ====
 +
 +=== Materials/​Underground ===
 +
 +  Continues from 3 month plan
 ===== 12 Month Planning ===== ===== 12 Month Planning =====
  
 +
 +  * Android Diagnostic mode that can be turned on to send more info for debugging.
 +    * Use switch under preferences to turn on or eggman.txt style if neccessary (program won't start). Could be turned on at a server level although this may not help if they can't connect.
 +
 +
 +
 +
 +====== Mobile Planning as of March 20, 2013 ======
 +
 +
 +===== 3 Month Planning =====
 +
 +This is approaching the limits of what we can do in 3 months but the things that fall off the back end will probably be priorities in the next 3 month cycle.
 +
 +  * Leica Cell Driver (Mike) 1.0
 +  * Topcon SR Radio and Cell compatibility(when available) (Mike) .1
 +  * SmartGrade Labeling and Progress Topo (Bill) .8
 +  * Access API for IOS client (depends on hire schedule) (Mike) 1.0
 +  * ADF to 4D import API (Bill) 1.0
 +  * ADF Writer functionality expansion (Bill) .66 
 +    * Key protected 1.0
 +    * AGTEK Access Upload 1.0
 +    * Read and Alignment of PDF/​Images/​KMZ 0
 +  * Deferred Uploader/​Android AGTEK Access (Mike) ​
 +  * SmartPlan for Android/IOS (Bill, Mike, Consultant to be named later)
 +  * Amazon Server Redundancy Planning & Implementation (Mike)
 +
 +
 +===== 6 Month Planning =====
 +
 +  * AGTEK Access Drive Explorer implementation (ala' Dropbox) (Mike )
 +  * SmartTrack
 +  * Android Tablet optimized layouts
 +  * Trimble Driver SmartGrade
 +
 +
 +===== 12 Month Planning =====
  
  
 +  * Android Diagnostic mode that can be turned on to send more info for debugging.
 +    * Use switch under preferences to turn on or eggman.txt style if neccessary (program won't start). Could be turned on at a server level although this may not help if they can't connect.
 +  * Machine Control (this may never happen)
  
-====== ​As of December 19, 2012 ======+====== ​Mobile Planning as of December 19, 2012 ======
  
  
product_development_planning.1363819616.txt.gz ยท Last modified: 2013/03/20 22:46 by mikeclapp