Underground Notes
Current deficiencies, Important features & Goals
First Release
Depth Brackets (required) Goal Breakdown by pipe runs for analysis (quantities )
Square pipe, ellipsoidal pipe, multiple pipe, varying pipe thickness. (deficiencies)
Strata in depth brackets
Select Backfill calculation (deficiency)
Quantities within Underground (deficiency)
LandXML export of trench bottom (Goal)
Trench Spec to Template in GW application
Depth Brackets
The depth brackets function is complete compared to previous versions but has additional breakdown
Should we default label pipes, structures and fittings? For example if I enter in pipe label the line between each point 8“ SD -1, -2, -3 and break those out in reports. The user could customize the label
We need a quantity report in the Underground program itself. If pipe runs were labeled then breaking out and subtotaling those values also becomes easier as well as showing rock quantities.
Second Feature Release
Standalone capability (deficiency)
COGO entry of pipe runs (Goal)
Sections for in roadway - Breakdown numbers in roadway differently or just put report region for different costs.