This is an old revision of the document!
Start 2012-11-19
| Task Number | Owner | Estimate | Actual | Status | Description | 
|---|---|---|---|---|---|
| 0.1 | Mike A | 1 | 1 | Done | Make SVN repository, base application, base layout | 
| 0.2 | Mike A | 2 | 1 | Done | Write/modify shot collector/sorter, for set from GPS, save to file, add Control to project folder | 
| 0.3 | Mike A | 1 | 2 | Done | Writer set from file, download, read parse | 
| 0.4 | Mike A | 1 | 17 | Done | Implement Altus base functionality, add abstract methods to provider, also known as 10.3.2 in SmartDirt | 
| 0.5 | Mike A | 1 | 4 | Done | Implement Topcon base functionality | 
| Total | 6 | 25 | 
Story Velocity == (as of COB )
Complete 2012-11-
Cal Duration:
Cal Velocity: