Earlier track system work for 2014 was completed here:
Most of the track work needed to be integrated into the trunk code line and then deployed. For October/November 2014 an Access Project is as follows:
Start 2014-10-13
Task Number | Owner | Estimate | Actual | Status | Description |
---|---|---|---|---|---|
4.1 | Deploy 1.20 on production server | ||||
4.1.1 | Mike A | 1 | Merge 1.20 to trunk | ||
4.1.2 | Mike A | 2 | Test against a production MySQL copy to test upgrade state | ||
4.2 | Mike A | 1 | Bring up medium instance on AWS | ||
4.3 | Mike A | 1 | Build utilization report | ||
4.4 | Adjust update table to lock out updates for all but AGTEK | ||||
4.4.1 | Mike A | 1 | Extend table for new attributes, extend update msg in protobuf | ||
4.4.2 | Mike A | 1 | Adjust logic in server update check to obey “restrict” | ||
4.4.3 | Mike A | 1 | Modify support tool to allow for “restrict” lock on app | ||
Total | 8 | X |
Story Velocity ==
Complete