This is an old revision of the document!
October Suprise
Earlier track system work for 2014 was completed here:
Most of the track work needed to be integrated into the trunk code line and then deployed. For October/November 2014 an Access Project is as follows:
-  Merge Access Track 1.20 into the trunk. 
-  Adjust the application version table to be able to lock out updates (except for AGTEK) add simple descriptive text. 
-  Add a report being requested by the AGTEK Business office. 
-  Upgrade the server to a medium instance, prep the way for a dual server instance.