Table of Contents

Materials/Underground (no 3D or 4D)

Version 1.06e (2nd Release)

This is the followup to the initial release of Materials but also Underground and is intended to both clean up some unfinished issues and add functionality that was not done for the initial release.

Curb and Gutter Output (Arc retention support) Phases on Materials Cost Code Lists (Access synced) Bidding Excel Outputs Bid2Win & HCSS (others?) Access Synced Structures and Materials lists Optimized KMZ files

Phasing for Highway Applying Trenches to Templates

More Standalone Materials and/or Underground

* Access synchronized Structures/Materials/Cost Code Lists

Adding Cost Codes and Excel formatting to Materials/Underground

The parts

Common Code Lists in Access. Downloadable and kept synced on startup Increased Size of Structure Dialog. A

Do Phases choices in Materials section since we have to increase the size of the dialog anyway for this change.

Importing cost code lists as Structures

User Flow

The user has structures lists with Cost codes in them (ask Scott, is a code part of a structure or part of material or both) Upon startup if internet available, the progam checks the existing code lists against the code lists up there and downloads new ones as necessary. Code lists exist on the local machine, can be edited and uploaded there to the server.

Bid2 Win Format Excel

Bid2Win has a specific column format for export.

Column Value

A B C D G

Symbol import of SVG files

We talked about making symbols earlier from SVG files and I verified the current way they can be added. Attached is a svg file that was just a SS manhole modified to have a solid center circle. If placed in the \AGTEK\Resources\Symbols folder on startup the program creates png equivalent. If Edit symbols within Materials is used it will appear there as an option but needs to be enabled on that list to be used.

Ideally we’d streamline the process by adding an import on the Symbols dialog and allow picking .svg and maybe .png files to import so the process is a little less opaque. I don’t anticipate supporting every sort of svg file because they can have everything from bitmaps to gradients within them and we would not be able to display them correctly. That said we can probably parse the file and just use the things we can read which is pretty rich and a better representation of most things drawn on plan sheets.

I see no reason for us to create functions to draw .svg files like the old materials. Inkscape is free and capable and there are plenty of others out there as well. We can also supplement it more icons ourselves.

FYI, I’m working on the story for code lists but that also includes storing Structures and Materials lists on the cloud. By reading Scott’s reply it looks like he’s mainly looking for codes on structures rather than Materials but I’m going to clarify that. The natural way to support code lists that follow the current patten of Materials and Structures is to have a Code list dialog similar to Materials on the Edit menu. From there we could import/export/upload and it would save to a .csv similar to what we do now. We’ll add the upload to the Materials and Structure dialogs as well but that will require us to build the support into the server for them. Not difficult since the pattern is already established but something we may stage later depending on timing. Also because we need to widen the Structure window to support a code list column, it’s probably also the time to add materials phasing that we’ve been planning for.

Old Specification

I no longer have any association with this program (MC) 9/25/2018

This a rewrite to a common codebase with Earthwork but it is a standalone program. There is no dependence on Sitework/Gradework and Underground is not integrated either. The basic concept is:

Foundations

Earthwork Integration

Features

Floating palettes during entry. May require right-click ala Sitework to go into an intermediate mode for selection of different structure

Work Layers - A user nameable organization method. For example we might create a demolition work layer with several phases.

Materials Calculator? Typing in calculations for structure entry (ie 1.4'/12) etc. or a dedicated calculator for common conversions.

User created PNG symbols - Also exported to Google Earth and supporting transparency. SVG too?

Filtering on reports reflected on graphics -

Support for PNG/SVG User patterns

Screen Prototypes

Some early screen element prototypes. More designed to show the complete screens rather than steps.

Materials Toolbar Options

This is an amalgamation of the existing materials and sitework where appropriate. The descriptions are: L-R

Future Features

Do we support Cost Codes on Structures or Materials?

Adding columns of user defined data

Shared Structures, Materials, Cost Code lists to and from AGTEK Access. The cost code list is already supported by Access.

Menus

Now Sitework 2018
File File File
New New New
Open Open Open
——– Recent Files Recent Files
Close Import Import > Structures List
Save Merge Merge PDF
Save As ———– —————- Tiff
—————- Save Save DXF/DWG
Import Save As Save As
Import Structures List Export Export > KMZ
Export KMZ File —————– ——————— AGT
Export > AGT,Excel,Text Page Setup Page Setup CSV
————— Print Print XLS
Page Setup Send to Print Page Send to Print Page
Print —————— ——————–
Send to Print Page Exit Exit
—————
Exit
Now Sitework 2018
Edit Edit Edit
Undo Undo Undo
———- Redo Redo
Copy ——— ———
Paste Copy Copy
Delete Paste Paste
————— Delete Delete
Classes ——— ——–
Phases Strata Names Work Layers
————– Report Region Phases
Structures Balance Region —————–
Materials —————— Structures List
————— Break Line Materials List
Symbols Move Start Symbols
————— Raise/Lower ——————-
Tablet Scale ——————- Break Line
Label Selection Move Start
Find Elevation ——————-
——————– Label Selection
Area Select Area Select
Select All Select All
—————–
Tablet Scale (32 bit)

Cost Codes as part of output (for HCSS, Hard Dollar, for Subs)

Icons Materials Modes

Icons Materials Actions

Icons New Materials Suggested

Modes moved up Ala' Sitework 4D

Story 1 - Materials Takeoff from PDF

Joe Customer needs to bid a job and gets the PDF plan set. It's got demo, dirt, & paving on it. First step is he starts Materials and Imports the PDF sheets he cares about. As Allen explained it's often about getting info out to subs for their bid.

Current Reports

I haven't found anybody who uses sequence and I believe it's a vestige of the old Edge Materials that didn't have onscreen reporting for identifying item. I suggest we kill it.

Dave has a floating Report window that's a natural to float on a second screen although it can be docked like the existing one.

Structure Measure Detail Report

This example can be copied for the other reports. The primary change is the addition the code field that's sortable. Likewise the Materials report would use the code attached to that material. This is just a string designed to make integration from other systems easier.

Other changes include a visual separation between Structures, elimination of sequence, a different symbol and representation of holes instead of just negative values. A slight bolding of totals. At the bottom are buttons to print directly, send to the print page, export the results (csv, XML?, Json?) and close.

All fields allow for sorting on any column

View/Display suggestion using the Report Window

Probably not on first release but the Report window could also serve as a unique way of reporting and filtering what is shown on the screen and reported. I'm guessing it's not possible on the first release. The idea is being able to pick any field and apply a filter based on it. For example, right clicking on a Layer cell displays a menu that allows sort changes, clearing a current filter on that column, or setting to only show that value or the inverse. Numeric values could allow greater than or less than values like Greater than 10,000 or less than. The ability to cascade filters among multiple values creates very specific reports with far greater flexibility than just the phase and work layer method and also controls visibility.

Story 1 - Using Materials Structures for Sitework Sectional Areas

When a customer has both Sitework/Gradework and Materials one of the benefits of a shared file format is the ability to designate Sectional areas with a Structure from the structure list. Likewise, Materials Structures should be able to be designated for use as a sectional area in Site files.

Modified Report Region Dialog

This is the current Report Region Dialog modified to add the Structure information.

NOTE: The program currently brings up the Line Editor for Sectional Areas and Report Regions. It should really bring up this window instead

Notice that the Sectional Depth is greyed because the Structure is set from the Structure list. The buttons to the right of the Structure combobox are to display the structure list and add a new structure. In the case of adding a new structure we'll display the Structures windows.

And when a Structure is picked the Sectional depth is applied from that structure value and the Materials breakdown displays below it.

When a Materials Takeoff Comes First

There's many times when the materials takeoff is done before the earthwork. In those cases we'd like to be able to apply the Area Structures as Sectional Regions in the Earthwork takeoff but that likely has to take place after the Design data is entered. In fact the user doing the sitework takeoff will likely want to snap to some of the Materials entries.

My proposal is that we add a Materials Layer. Not only does that allow segregated information that users can snap to but it also provides the beginning of a mechanism to tell the program to use an area also as a sectional area/report region. In this view we should also support the saved colors and patterns of the structures rather than the randomized ones currently done by Sitework.

Materials 1.1 Paving & Curb & Gutter workflow

While Earthwork could have this functionality I'm going to argue that this belongs in Materials to broaden our Materials only market. It actually adds the first element of 3D as well and starts the trend to make Materials a full fledged product line. If the customer does have Sitework and Materials we can leverage capabilities like conform, etc. but it has to be allowed to work standalone.

Intro

Automated machine control systems use to just read a 3d Polyline and use that for guidance. They've evolved to require COGO representations instead and that includes two lines for the curb and the centerline for the stationing. That includes both horizontal and vertical COGO. The output mechanism of choice is LandXML.

While we can offer advantages to Leica paving systems the export model extends to other brands. Some of the chief Leica advantages are the ConX connection, the use of mobile apps in demo, and our support.

Our advantages are broadening a market to companies outside of earthwork, mobile app proliferation, and expansion of tracking to paving tracks.

General workflow

Happy Path

CAD file contains necessary lines specified as COGO and has three-dimensions

https://agtek.s3.amazonaws.com/Agtek/I3IsqbHipmgC