October Suprise

Earlier track system work for 2014 was completed here:

Most of the track work needed to be integrated into the trunk code line and then deployed. For October/November 2014 an Access Project is as follows:

Story 4 - October Suprise

Start 2014-10-13

Task Number Owner Estimate Actual Status Description
4.1 Deploy 1.20 on production server
4.1.1 Mike A 1 0 Done Merge 1.20 to trunk
4.1.2 Mike A 2 1 Done Test against a production MySQL copy to test upgrade state
4.2 Mike A 1 Bring up medium instance on AWS
4.3 Mike A 1 Build utilization report
4.4 Adjust update table to lock out updates for all but AGTEK
4.4.1 Mike A 1 0.5 Done Extend table for new attributes, extend update msg in protobuf
4.4.2 Mike A 1 0.5 Done Adjust logic in server update check to obey “restrict”
4.4.3 Mike A 1 Modify support tool to allow for “restrict” lock on app
Total 8 X

Story Velocity ==

Complete