====== Development Planning as of Jan 13, 2014 ====== ===== 3 Month Planning ===== This is approaching the limits of what we can do in 3 months but the things that fall off the back end will probably be priorities in the next 3 month cycle. ==== Mobile ==== * SmartPlan IOS (Mike, Focalshift) * Deferred Uploader Android Service (Mike) * Access SmartTrack Management API's (Mike) * SmartTrack Management (Bill & Mike) * SmartTrack Finish (Bill) * SmartBlade Start - (Machine Control) (Bill) * Amazon Server Redundancy Implementation (Mike) ==== Desktop ==== === Trackwork === * Incorporate new Track API (Dave/Mike) * Strip CAD and ProfUIS (Dave) * New Device Support (G-Ray2, other?) * Revamp Import Window (Dave) * Report View (compile multiple reports) (Dave) === Import/Export (cross program)=== * AEC Hwy CAD Object translation (COGO, etc) (George * GPX support- extension for Trackwork (tracks with cycle lines/compass) (George) * Update TrackReader with new Server API support/Devices (George) === Materials/Underground === This project will take longer than three months to complete and should be considered a future foundation for other products. * New 4D Platform * As much platform independence as possible (hedging our Microsoft bet) * Common File Format - simple interchange between Sitework and Materials. * Multiple monitor support * Floating controls/windows * 64 Bit * International Support (text broken out for easier translation) * True 3D support (sloped areas, sloped structures, using Sitework surfaces) * Structure entry (Pipe, UG structures, retaining walls, abutments) * Export of 3D structure models to Google Earth (Collada) * New Print Page * Pipe and other structure visualization * Completion time assignment/Playback * Linkable (http) field/notes (used in mobile apps for supplier/vendor information * Transfer of Structures to Sitework Sectionals. Two-way data transfer ===== 6 Month Planning ===== ==== Mobile ==== * Javad Support * AGTEK Access Drive Explorer implementation (ala' Dropbox) (Mike ) * Topcon SR Radio and Cell compatibility (Mike) * Android Tablet optimized layouts (partial, some new layouts are implemented in SmartPlan and SmartTrack) ==== Desktop ==== === Materials/Underground === Continues from 3 month plan ===== 12 Month Planning ===== * Android Diagnostic mode that can be turned on to send more info for debugging. * Use switch under preferences to turn on or eggman.txt style if neccessary (program won't start). Could be turned on at a server level although this may not help if they can't connect. ====== Mobile Planning as of March 20, 2013 ====== ===== 3 Month Planning ===== This is approaching the limits of what we can do in 3 months but the things that fall off the back end will probably be priorities in the next 3 month cycle. * Leica Cell Driver (Mike) 1.0 * Topcon SR Radio and Cell compatibility(when available) (Mike) .1 * SmartGrade Labeling and Progress Topo (Bill) .8 * Access API for IOS client (depends on hire schedule) (Mike) 1.0 * ADF to 4D import API (Bill) 1.0 * ADF Writer functionality expansion (Bill) .66 * Key protected 1.0 * AGTEK Access Upload 1.0 * Read and Alignment of PDF/Images/KMZ 0 * Deferred Uploader/Android AGTEK Access (Mike) * SmartPlan for Android/IOS (Bill, Mike, Consultant to be named later) * Amazon Server Redundancy Planning & Implementation (Mike) ===== 6 Month Planning ===== * AGTEK Access Drive Explorer implementation (ala' Dropbox) (Mike ) * SmartTrack * Android Tablet optimized layouts * Trimble Driver SmartGrade ===== 12 Month Planning ===== * Android Diagnostic mode that can be turned on to send more info for debugging. * Use switch under preferences to turn on or eggman.txt style if neccessary (program won't start). Could be turned on at a server level although this may not help if they can't connect. * Machine Control (this may never happen) ====== Mobile Planning as of December 19, 2012 ====== ===== 3 Month Planning ===== In general order of implementation (barring impediments like no cell subscription) * SmartGrade RTK - Altus Cell Driver (Mike) * Base Station Setup - Topcon Driver (Mike) * AGTEK Access Setup * SmartDirt Picture Point Tracking (Mike) * SmartGrade RTK - Stockpile (Bill) - includes Collada Export * SmartGrade RTK - Progress Topo * Access API for IOS client (depends on hire schedule) (Mike) * ADF to 4D import API (Bill) * Amazon Server Redundancy Planning & Implementation (Mike) ===== 6 Month Planning ===== Since this is farther out, the order of projects is much more variable. * AGTEK Access/Explorer implementation (ala' Dropbox) (Mike) * PlanView App * Machine Control * Android Tablet optimized layouts ===== 12 Month Planning =====