Line 118: Line 118:
  
 ====== Trackwork Revamp 2014 ====== ====== Trackwork Revamp 2014 ======
 +
 +===== Story 1 ====
  
   * De-ProfUIS   * De-ProfUIS
   * Remove unneeded elements (CAD, etc)   * Remove unneeded elements (CAD, etc)
 +  * Allow haul planning using surfaces other than just Design/​Subgrade,​ Existing/​Stripped
 +  * Shaders rehab
 +  * Rework Import window
 +  * Enable Network Operations by default
 +  * Create 4D look and feel
 +
 +===== Story 2 ====
 +
   * Improve Reporting   * Improve Reporting
      * Multiple equipment details and summary      * Multiple equipment details and summary
      * Multiple days      * Multiple days
-     * Multiple equipment types  +     * Multiple equipment types   ​
-  * Allow haul planning using surfaces other than just Design/​Subgrade,​ Existing/​Stripped +
-  * Shaders rehab+
   * Saving cycle lines, summary statistics to server   * Saving cycle lines, summary statistics to server
   * Support Machine types   * Support Machine types
     * Color shades (ie; Scrapers are shades of green)     * Color shades (ie; Scrapers are shades of green)
-  * Rework Import window 
- 
 ====== State Data saved for the Trackwork System ====== ====== State Data saved for the Trackwork System ======
  
Line 185: Line 191:
    * The time in seconds to make a single haul broken out into 4 distinct phases (Load, Haul, Unload, return) each with it's own speed that makes up the total cycle time)    * The time in seconds to make a single haul broken out into 4 distinct phases (Load, Haul, Unload, return) each with it's own speed that makes up the total cycle time)
    * The number of total cycles required to complete the dirt movement    * The number of total cycles required to complete the dirt movement
-   * Average yds per machine (does it make sense to have some sort of machine assignment database from the server.)+   * Average yds per machine (does it make sense to have some sort of machine assignment database from the server ​since we already use it for SmartTrack.)
  
 This information can go to the field as a comparison to actual or even as guideline to the superitendent. This information can go to the field as a comparison to actual or even as guideline to the superitendent.
Line 200: Line 206:
  
 From a presentation perspective imagine a Google Earth file showing expected progress at a day or week along with actual as collected by trackers. From a presentation perspective imagine a Google Earth file showing expected progress at a day or week along with actual as collected by trackers.
 +
 +
 +===== Trackwork for Materials/​Phasing =====
 +
 +Trackwork has traditionally been about dirt. A significant part of more complicated projects is the phasing and Trackwork has the opportunity to handle this aspect of the job site as well. Features might be:
 +
 +  * Read Materials and earthwork files
 +  * Allow assignment of completion times and order to phases
 +  * Easier and better phasing after the fact.
 +  * Time bar display of times by completion
 +  * KMZ export for presentation
 +
 +
 +
 +
 +
 +
 +
  
  