Line 1: Line 1:
 +====== Story 8 Editing & Reassignment - Current Story  ======
 +
 +Handing off trackers to the UK is highlighting issues with the handoff and the ability to move trackers to other projects, merge tracks, and otherwise edit historical tracks & machines as well as set trackers to new settings. Some of the ability exists now but is spread across projects and/or is not available without a developer mode turned on. 
 +
 +
 +
 +===== Changing Future Tracker Settings Remotely =====
 +
 +With Eggman we currently have an additional set of controls available to change values on a tracker going forward to future tracks. These controls currently include:
 +
 +  * Project
 +  * Upload Frequency
 +  * Motion Timeout
 +  * Motion Monitor
 +  * Send Event Log
 +  * Send event log email
 +
 +Of these probably only Project is appropriate for general users to edit. The remainder are debugging controls probably still only appropriate to us. The question is are there any other settings we should expose or if this is the only one should we just move it to the machine page with the other machine characteristics. It should also be noted that the current page does not show the current state but simply shows the options that will be set.
 +
 +==== Proposed Machine Page setting for changing Projects ====
 +
 +My proposal is to change the existing Machine page to allow changing of the project assigned similar to what we do for reassigning a tracker to a vehicle.
 +
 +When the Machine is pressed it displays the machine settings (name, type, color, etc.). I propose to add one more option at the bottom with some white space between it and the rest to change the project it's assigned to. 
 +
 +
 +
 +
 +
 +
 + 
 +
 +
 +
 +===== Editing Existing Tracks =====
 +
 +
 +
 +=== Moving Tracks between Projects ===
 +
 +
 +=== Merging Tracks ===
 +
 +There are a couple of reason to merge tracks
 +
 +
 +===== Editing Machine Names =====
 +
 +
 +
 +
 +
 +===== Cleaning up the Machines List =====
 +
 +Our Sale Loaners a perfect example of 
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 ====== Story 1 ====== ====== Story 1 ======
  
Line 525: Line 597:
  
  
-====== Story ======+====== Story ======
  
   * Implementing Cost Code (Tag) Interface and supporting Server mechanism   * Implementing Cost Code (Tag) Interface and supporting Server mechanism
-  * Add Daily Log menu option to show day's summary+  * Add Journal ​menu option to show daily individual and project summaries
  
  
Line 556: Line 628:
 Adding an option to set the default Cost list to the Project defaults is simple from a user interface perspective but more complicated underneath Adding an option to set the default Cost list to the Project defaults is simple from a user interface perspective but more complicated underneath
  
-===== Daily Log Usage =====+===== Journal ​Usage =====
  
-The Daily log is an outgrowth of cost codes and the idea of collating project information from a variety of sources to Access. It may become a feature of all mobile apps that use cost codes. ​+The Journal ​is an outgrowth of cost codes and the idea of collating project information from a variety of sources to Access. It may become a feature of all mobile apps that use cost codes. ​
  
-The idea is to give the user a daily summary of what's he's submitting. There'​s potentially a split view that shows his submittals and another that shows all submittals for that day. And since it's a summary I'd like to keep to a single line per entry but with the ability to expand or go-to the detail on a line item. +The idea is to give the user a summary of what's he's submitting. There'​s potentially a split view that shows his submittals and another that shows all submittals for that day. And since it's a summary I'd like to keep to a single line per entry but with the ability to expand or go-to the detail on a line item. 
  
  
Line 567: Line 639:
 Elements and things to think about Elements and things to think about
  
-  * Project selection or current project. Does the user just see the project he has open or are their choices. The guy on one particular job has a different need than the area superintendent- higher management. How to finesse or do we just get abritarily ​simple. Since this is possibly an independent app masquerading as part of another app maybe we allow the app when chosen separately to first ask the project. +  * Project selection or current project. Does the user just see the project he has open or are their choices. The guy on one particular job has a different need than the area superintendent- higher management. How to finesse or do we just get arbitrarily ​simple. Since this is possibly an independent app masquerading as part of another app maybe we allow the app when chosen separately to first ask the project. ​(I'm leaning towards programs calling the app to auto choose the current project but when the app is opened separately give the user a choice of projects.) 
-  * Split choice screen like Local/​Access on the File list. This would be My Log/ Project ​Log so a user could see just what they had done or could see the entire Project Log+  * Split choice screen like Local/​Access on the File list. This would be Journa/ Project ​Journal ​so a user could see just what they had done or could see the entire Project Log
   * Some items are single entries. Notes, Pictures, Measure Areas, but some are ongoing like machines. Do we allow hourly summaries for them? Is it a reporting log setting?   * Some items are single entries. Notes, Pictures, Measure Areas, but some are ongoing like machines. Do we allow hourly summaries for them? Is it a reporting log setting?
   * Sorting may need to be multi-level and allow filtering. Like just show all notes or only show machines for the last hour. The challenge will be to be mobile friendly. I may look at Zillow and Redfin apps for methods of filtering in apps since that's a major function for them.   * Sorting may need to be multi-level and allow filtering. Like just show all notes or only show machines for the last hour. The challenge will be to be mobile friendly. I may look at Zillow and Redfin apps for methods of filtering in apps since that's a major function for them.
Line 574: Line 646:
   * The single line event is customizable (how to keep simple) because different jobs have different focus. Some users care about cycle time (Barry Blanchard). Others care about move time, start time, cycles, etc. And I would be surprised if that even changed from job to job even within the same company.   * The single line event is customizable (how to keep simple) because different jobs have different focus. Some users care about cycle time (Barry Blanchard). Others care about move time, start time, cycles, etc. And I would be surprised if that even changed from job to job even within the same company.
   * All this means we'll need settings. Multilevel Sort   * All this means we'll need settings. Multilevel Sort
-  * +  * Set Equipment reminders/ Statistics events. For example a user could set a log entry to calculate statistics on a machine/​job?​ every hour or statistics as 10 AM. (Note, as I think about this I realize that this event structure is probably something that is both involved and may take a while to evolve.
  
  
Line 656: Line 728:
  
  
-====== Story TBD ======+====== Story 10 TBD ======
  
 Moved from Story 7. TBD Moved from Story 7. TBD
Line 675: Line 747:
  
  
-====== Story Truck Versions ======+====== Story 11 Truck Versions ======
  
 We have a general idea of how Trucks operate on the job site but this will be our first pass at handling the slightly different needs. Some features/​statistics to consider are street map display instead of file backgrounds and stats like ETA and their display. Trucks are also used for different roles from dirt export/​import,​ materials import (like rock) to very  JIT things like paving. We have a general idea of how Trucks operate on the job site but this will be our first pass at handling the slightly different needs. Some features/​statistics to consider are street map display instead of file backgrounds and stats like ETA and their display. Trucks are also used for different roles from dirt export/​import,​ materials import (like rock) to very  JIT things like paving.